Chongqing Sote Salt & Chemical Co., Ltd. – Disclosure of Responsibilities for the Prevention and Control of Hazardous Waste Pollution
Category: Notices
Release time: 2022-12-22
Summary:
Chongqing Sote Salt & Chemical Co., Ltd.
Disclosure of Responsibilities for the Prevention and Control of Hazardous Waste Pollution
In accordance with the "Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste," entities that generate solid waste shall, in compliance with the law, promptly disclose information on the prevention and control of environmental pollution caused by hazardous waste and proactively accept public oversight. Our company hereby discloses information on the prevention and control of environmental pollution caused by hazardous waste and welcomes public supervision.
Company Name: Chongqing Sote Salt & Chemical Co., Ltd.
Address: Longxiang Avenue, Wanzhou District, Chongqing City Number 98
I. Existing hazardous waste of the company
|
Preface Number |
Hazardous waste name |
Waste Category |
Hazardous properties |
Source and Production Production process |
Disposal measures |
Responsible person |
Note |
|
1 |
Waste mineral oil |
HW08 |
T/I |
Waste mineral oil generated during the production processes of each work section |
Entrust the disposal to a qualified enterprise. |
Cheng Long |
|
|
2 |
Waste packaging materials |
HW49 |
T/In |
Waste packaging containing or contaminated with toxic hazardous waste |
Entrust the disposal to a qualified enterprise. |
Cheng Long |
|
|
3 |
Waste lead-acid batteries |
HW31 |
T |
Waste lead-acid batteries generated from daily replacement |
Entrust the disposal to a qualified enterprise. |
Cheng Long |
|
II. Company Hazardous Waste Storage Facilities
Factory site setup One hazardous waste warehouse with a construction area of 216 m². 2 It is used for the temporary storage of hazardous waste within the plant and has undergone anti-seepage treatment; the concrete floor is equipped with... A 2mm impermeable membrane is laid first, followed by a 300mm-thick impermeable concrete leveling layer. The hazardous waste warehouse is equipped with fire extinguishers, fire-fighting sand, ground drainage ditches, collection wells, and 24-hour surveillance equipment.
- Company Hazardous Waste Management
(1) Collection and Transportation: Hazardous wastes generated by each production section shall be placed separately in the existing temporary storage areas for hazardous wastes, and then transported every three months via enclosed-cabin trucks along the factory roads to the hazardous waste warehouse.
(2) Warehousing: Before unloading hazardous waste items transferred to the hazardous waste warehouse, first check whether the hazardous waste items are properly labeled with information such as origin, quantity, and characteristics. Then, proceed with hazardous waste registration, recording the date of entry and storage location. After completing the inspection and registration, carry out the handover at the hazardous waste unloading area and move the hazardous waste to the hazardous waste warehouse for storage.
(3) Temporary Storage: The management personnel of the hazardous waste warehouse shall regularly inspect the stored hazardous materials. If any damage is detected, containers shall be replaced promptly, and leakage points shall be mopped and cleaned. The mop-water will be directed via drainage ditches into a collection pool, and after collection, the wastewater will be treated as hazardous waste.
(4) Outbound Delivery: Hazardous waste stored in the hazardous waste warehouse shall be regularly transferred and disposed of by a qualified hazardous waste disposal unit. Before outbound delivery, a hazardous waste transfer plan must be formulated in accordance with relevant national regulations and approved prior to any transfer. In addition, the "Hazardous Waste Transfer Management Measures" must be followed to complete the hazardous waste transfer manifest, and a hazardous waste management ledger must be established to accurately record details such as the type, quantity, and recipient of the transferred hazardous waste.
- Accident Emergency Plan
(1) Establish an internal rescue team
Establish an accident emergency rescue and command leadership group, composed of the enterprise’s legal representative, senior management, and heads of departments including production, safety and environmental protection, equipment, security, and health.
An accident emergency rescue command center shall be established, responsible for the organization and coordination of emergency rescue operations throughout the plant in the event of an accident. The legal representative of the enterprise shall serve as the overall commander. If the legal representative is unavailable, designated senior leaders shall be clearly assigned full responsibility for emergency rescue operations. The organizational structure shall include an emergency response team, a communications and liaison team, an evacuation and guidance team, and a safety protection and rescue team, among others.
The leading command group shall be responsible for formulating and revising the enterprise’s emergency response plan for accidents; establishing an emergency rescue team; organizing the implementation and drills of the emergency plan in case of accidents; inspecting and supervising the implementation of preventive measures for hazardous sources and the preparation of emergency rescue resources. Once an accident occurs, rescue operations shall be carried out in accordance with the emergency response plan.
(2) Disclosure of the accident response plan
- In the event of a hazardous waste leak, immediately cease use, shut down the relevant equipment and systems, and promptly report to the emergency rescue command center.
- Open flames are strictly prohibited at the accident site. Cut off the power supply and promptly evacuate all personnel from the leak area to a safe location upwind. At the same time, establish a containment zone at the accident site and prohibit unauthorized personnel from entering.
- Emergency responders must be equipped with the necessary personal protective equipment, and acting alone is strictly prohibited. 。
- Use a pre-determined leak-sealing method to quickly plug the leak and cut off or control the source of the leak. Collect the leaked material as soon as possible.
Minor Leakage: Absorb with sand or other non-combustible materials. 。
Large-scale leakage: Contain in a secure container or spray with water mist. , Close attachment Near Drainage and outlet structures to prevent materials from flowing out along open channels and contaminating water bodies. 。
- Install evacuation guidance signs indicating the direction of evacuation within the factory premises.
(3) Fire Emergency Measures
1. If a fire is discovered, immediately call the fire department and use firefighting equipment to extinguish the blaze. First, employ fire extinguishers such as solvent-resistant foam, dry powder, or carbon dioxide, as well as fire sand, to put out the fire. You can also use water to cool the walls, thereby reducing the burning rate. 。
2. Cut off the pathways for fire to spread, cool and evacuate enclosed containers and combustible materials threatened by the fire, contain the burning area, and actively rescue injured and trapped personnel. 。
3, Notify the relevant departments responsible for safety, fire protection, emergency medical services, and others to activate the corresponding emergency response procedures. 。
4. Organize a rescue team, cordon off the scene, and evacuate personnel. 。
5, After the firefighting operations are completed, the site will be restored and cleaned up. 。
6. Investigate and identify the cause of the accident, prepare an accident assessment report, and supplement or revise accident prevention measures and emergency plans.
Keywords: Chongqing Sote Salt & Chemical Co., Ltd. – Disclosure of Responsibilities for the Prevention and Control of Hazardous Waste Pollution
Relevant Information
-
Promoting the Model Worker Spirit and Unleashing Innovative Momentum — The Xiangyu Salt Chemical Model Worker Innovation Studio Officially Launched
Time:2026-08-01
-
Xiangyu Salt Chemical Held a Conference to Celebrate the 105th Anniversary of the Founding of the Communist Party of China and the “July 1” Commendation Ceremony.
Time:2026-07-06
-
Public Disclosure of Pollution Emissions by Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-07-06
-
Railway-Enterprise Collaboration Ushers in a Strong Start for Xiangyu Salt Chemical’s Rail Freight Operations
Time:2026-02-28
-
Chen Wei, Deputy Secretary of the Group Party Committee, Vice Chairman, and General Manager, led an assessment team to Xiangyu Salt Chemical and the Southwest Regional Branch to carry out performance evaluations.
Time:2026-01-23
