Detailed Route Planning for the Sot Salt Chemical New Brine Pipeline Project (Second Price Comparison)

Category: Bidding

Release time: 2026-09-04

Summary:

1. Price Comparison Conditions
Sote Salt Chemical Co., Ltd. plans to construct a new brine‑transport pipeline and is required to prepare a detailed master plan aligned with the overall urban development plan of Wanzhou District, based on the preliminary site survey conducted by the project developer. The plan must also appropriately avoid existing underground utility networks, railways, bridges, expressways, and other critical surface structures. The project owner is Chongqing Sote Salt Chemical Co., Ltd., with funding to be self‑financed. All conditions for price comparison have been met, and a competitive bidding process is now being initiated for the preparation of this detailed master plan.
2. Project Overview and Scope of Price Comparison
2.1 Project Location
Gaofeng Subdistrict—Shuanghekou Subdistrict—Longdu Subdistrict: Gaofeng Changyan Mine (buried pipeline installation)—Gaofeng Middle Road (buried pipeline installation)—Gaofeng Lingfeng Mountain (directional drilling crossing)—Mengzi East Road (buried pipeline installation)—Qinggangbang Interchange (pipe-jacking crossing)—Changqing Road (pipeline support installation/overbridge utility tunnel installation)—Sote Salt Chemicals’ salt‑making workshop.
2.2 Project Overview and Technical Proposal
Chongqing Sote Salt Chemical Co., Ltd. plans to construct a new Φ530 mm brine‑transport pipeline, which will be laid underground in a common trench. The pipeline will run from the Gaofeng Field rock‑salt mine in Gaofeng Subdistrict to the salt‑production workshop within Chongqing Sote Salt Chemical Co., Ltd. in Longdu Subdistrict. The entire route lies within Wanzhou District, Chongqing, passing through Gaofeng Town, Shuanghekou Subdistrict, and Longdu Subdistrict, with a total length of approximately 11.8 km.
In the non‑directional drilling crossing section, Φ530 mm steel‑reinforced polyethylene composite pipes are joined using specialized electrofusion fittings; these pipes are installed either underground, on pipe supports, or within a pipe rack (for the bridge‑underpass segment). In the directional drilling crossing section, straight‑seam submerged‑arc welded steel pipes are employed, with a high‑temperature‑resistant PE liner. The PE liner is bonded to the inner surface of the seamless pipe under high pressure, and flanged connections are used at both ends of the directional drilling crossing. The design pressure is 2.0 MPa.
2.3 Scope of Services
(1) The detailed plan shall, to the greatest extent possible, be implemented in accordance with the route identified during the construction entity’s preliminary site survey. If it is indeed necessary to avoid existing underground utility networks, railways, bridges, expressways, or other critical above‑ground structures, the pipeline route shall be adjusted through joint consultation among the construction entity and the feasibility study preparation unit.
(2) The detailed plan must be approved by the Wanzhou District Bureau of Planning and Natural Resources and undergo review by industry experts, and ultimately obtain approval from the Wanzhou District Government.
(3) The detailed plan shall be incorporated into the Wanzhou District Territorial Spatial Plan.
(4) The preparing entity shall be responsible for negotiating and coordinating the feasibility of the pipeline route plan, ensuring that the plan obtains approval from the relevant rights‑holding or managing (regulatory) authorities.
(5) Process the preliminary land-use review and the site-selection opinion letter.
(6) Technical Requirements: Shall be in compliance with applicable laws and regulations, as well as relevant technical codes and standards issued by the state and industry.
2.4 Construction Period Requirements
Within six months after the contract is signed, issue the “Detailed Route Planning (Second Revision) for the New Brine Pipeline Project of Chongqing Suote Salt Chemical Co., Ltd.,” which has been reviewed and approved by the Wanzhou District Bureau of Planning and Natural Resources and industry experts.
2.5 Service and Quality Requirements
(1) Complies with the Law of the People’s Republic of China on Urban and Rural Planning, the Chongqing Municipal Regulations on Territorial Spatial Planning, the Chongqing Municipal Land Management Regulations, and other relevant laws, regulations, and national standards.
(2) The detailed plan must be approved by the Wanzhou District Bureau of Planning and Natural Resources and undergo review by industry experts, and ultimately obtain approval from the Wanzhou District Government.
(3) The detailed plan shall be incorporated into the Wanzhou District Territorial Spatial Plan.
(4) The preparing entity shall be responsible for negotiating and coordinating the feasibility of the pipeline route plan, ensuring that the plan obtains approval from the relevant rights‑holding or managing (regulatory) authorities.
3. Qualification Requirements for Bidders
3.1 Basic Qualification Requirements for Bidders
Bidders must be legal entities or other organizations duly registered within the territory of the People’s Republic of China.
3.2 Specific Qualification Requirements for the Project
Bidders must hold a certificate of qualification for urban and rural planning preparation, with a certification level of Grade B or higher.
3.3 This quotation does not accept consortium bids.
4. Quotation Deadline
Deadline: September 10, 2026 (Beijing Time).
5. Contact Information
Price Comparator: Chongqing Sote Salt Chemical Co., Ltd.
Address: No. 98, Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Peng Xingxiu Phone: 15923874799
6. Administrative Supervisory Authorities and Contact Information
This procurement activity is subject to the supervision of the Discipline Inspection and Supervision Group (the regulatory authority) for the Xiangyu Salt Chemical Region. Contact information: Tel. 023-61002070, Postal Code 404001, Email xyyhjw@126.com.
 

 

Disclaimer: The official platform for publishing this tender information is the official website of Chongqing Xiangyu Salt Chemical Co., Ltd. at http://www.cqxyyh.com. Except for this channel, our company has not published any tender information on any other websites, forums, or platforms. Any tender notices reproduced on other media that cite our company as the tendering entity are unauthorized reproductions and are deemed invalid; we reserve the right to pursue legal action.

Keywords: Detailed Route Planning for the Sot Salt Chemical New Brine Pipeline Project (Second Price Comparison)