Price Comparison Document for the Second Phase of the East-West Section of Wanzhong Road Project—Relocation and Installation Construction of the Xiangyu Salt Chemical Brine Pipeline and Its Associated Pipelines
Category: Bidding
Release time: 2024-07-16
Summary:
1. Price comparison conditions
This quotation project—Phase II Road Construction Project for the East and West Sections of Wanzhong Road, Chongqing Sote Salt & Chemical Co., Ltd.—including the relocation and installation of the Xiangyu Salt & Chemical brine pipeline and its associated pipelines—has been approved by Chongqing Sote Salt & Chemical Co., Ltd. The project owner is Chongqing Sote Salt & Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are hereby inviting quotations and conducting a competitive bidding process for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Outside the premises of Chongqing Sote Salt & Chemical Co., Ltd.
2.2 Project Scope: The second-phase road project for the east-west section of Wanzhong Road, Chongqing Suote Salt & Chemical Co., Ltd.—Relocation and Installation of the Xiangyu Salt Chemical Brine Pipeline and Associated Pipelines—Installation and Construction Works: For the salt production section of the east-west segment of Wanzhong Road, the brine pipelines to be installed include: Φ219×12 (medium pressure), Grade 20, approximately 1,220 meters; Φ219×12 (high pressure), Grade 20, approximately 863 meters; Φ273×14 (high pressure), Grade 20, approximately 265 meters; Φ159×12 (high pressure), Grade 20, approximately 207 meters; Φ89×8 (low pressure), Grade 20, approximately 98 meters; Φ426×10 (low pressure), Grade 20, approximately 267 meters; and Φ325×10 (low pressure), Grade 20, approximately 260 meters. This project involves installation and construction works, including auxiliary materials (such as welding electrodes, welding wires, oxygen, acetylene, argon, etc.), tools and equipment, lifting operations, non-destructive testing, and utilities such as water and electricity. For detailed information, please refer to the Bill of Quantities.
2.3 Construction Period: Completion within 60 calendar days from the start date notified by Party A (excluding coordination meetings; the specific start date will be determined based on Party A’s production schedule).
2.4 Project Scope: The second-phase road project for the east and west sections of Wanzhong Road, Chongqing Sote Salt & Chemical Co., Ltd.—Relocation and Installation of the Xiangyu Salt & Chemical Brine Pipeline and Associated Pipelines—Installation and Construction Works: For the salt production section of Wanzhong Road, the brine pipelines to be installed include: Φ219×12 (medium pressure), Grade 20, approximately 1,220 meters; Φ219×12 (high pressure), Grade 20, approximately 863 meters; Φ273×14 (high pressure), Grade 20, approximately 265 meters; Φ159×12 (high pressure), Grade 20, approximately 207 meters; Φ89×8 (low pressure), Grade 20, approximately 98 meters; Φ426×10 (low pressure), Grade 20, approximately 267 meters; and Φ325×10 (low pressure), Grade 20, approximately 260 meters. This project involves installation and construction works, including auxiliary materials (such as welding electrodes, welding wires, oxygen, acetylene, argon, etc.), tools and equipment, lifting operations, non-destructive testing, and utilities such as electricity and water. For detailed information, please refer to the Bill of Quantities.
3. Qualification Requirements for Bidders
3.1 For this price comparison, bidders must possess a valid Grade III or higher general contracting qualification for petrochemical engineering construction issued by the competent construction administrative authority, as well as an industrial pipeline installation license of Grade GC1 or higher. They must also have the requisite construction capabilities in terms of personnel, equipment, and financial resources.
3.1 This price comparison requires bidders to hold a valid safety production license.
3.1 Prior to the bid submission deadline, bidders must have completed at least one construction project in equipment installation or maintenance within the petrochemical industry over the past four years (from January 1, 2020, to the bid submission deadline).
4. Quotation deadline
Deadline: 5:30 p.m. (Beijing Time), July 22, 2024
5. Contact Information
Price Comparison Person: Chongqing Sote Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Sun Tongying
Phone: 13517321268
Disclaimer: The official platform for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against those responsible for such unauthorized reproduction.
Keywords: Price Comparison Document for the Second Phase of the East-West Section of Wanzhong Road Project—Relocation and Installation Construction of the Xiangyu Salt Chemical Brine Pipeline and Its Associated Pipelines
Relevant information
-
Selection Document for the Settlement Audit of the Access Road and Site Grading Works for Well ZK101 in the Xinfeng Mining Area Rock Salt Exploration Project of Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-11-10
-
Inquiry Letter for Rail Transport of Calcination Kiln Support Rollers (Wanzhou–Sanmenxia)
Time:2026-11-09
-
Price Comparison Document for the Installation of a Liquid Oxygen Pump with DC Busbar at Chongqing Xiangyu Salt Chemical Co., Ltd. (Second Price Comparison)
Time:2026-11-09
-
Topographic Map and Boundary Survey Bidding Documents for the Waste Salt Recovery and Comprehensive Utilization Project (Second Price Comparison)
Time:2026-11-09
-
Price Comparison Document for Outsourced Processing between Chongqing Xiangyu Salt Chemical and Sote Salt Chemical
Time:2026-11-09