Tender Documents for the Preparation of the Preliminary Design and Safety Facilities Design Report for Wells 209, 301, and 302 in the Gaofengchang Rock Salt Mining Area of Chongqing Suote Salt & Chemical Co., Ltd.

Category: Bidding

Release time: 2024-07-16

Summary:

1. Price comparison conditions
This quotation project involves the preparation of preliminary design and safety facility design reports for newly added wells 209, 301, and 302 in the Gaofengchang rock salt mining area of Chongqing Sote Salt Chemical Co., Ltd. The reports have been approved by Chongqing Sote Salt Chemical Co., Ltd. The project owner is Chongqing Sote Salt Chemical Co., Ltd., and the funding is sourced from the company’s own reserves. The project now meets the conditions for competitive bidding, and we are hereby inviting quotations for the preparation of these reports.
2. Project Overview and Price Comparison Scope
2.1 Project Location
In the Gaofengchang Rock Salt Mine Area of Chongqing Sote Salt & Chemical Co., Ltd.
2.2 Project Overview and Technical Solution
Based on the existing distribution of brine wells and the utilization status of rock salt resources in the Gaofengchang rock salt mining area, prepare preliminary designs for the newly added wells 209, 301, and 302, as well as safety facility designs. These designs must include drilling and construction plans for the brine wells, resource assessments, design of associated surface process pipelines for the brine wells, expansion and capacity enhancement designs for the water intake, centralized collection, and brine transportation sections following the increase in production scale, and safety facility designs.
Table of Newly Added Brine Well Head Coordinates in the Mining Area
Serial Number Brine Well Number (X) Coordinate (Y) Coordinate 2000 National Geodetic Coordinate System
1    209    3398406.001    36532486.500    
2    301    3398302.153    36531990.032    
3    302    3398051.573    36531548.920    

2.3 Project Scale
The newly added wells 209, 301, and 302 each have a designed production capacity of 110,000 tons per year (in terms of brine-to-salt conversion).
2.4 Contract Term
60 calendar days.
2.5 Service and Quality Requirements
(1) Complies with relevant technical specifications and standards issued by the state and industry, such as the “Technical Specifications for Well Drilling in Salt Mines,” the “Geological Work Specifications for Underground Mining of Rock Salt by Water Solubilization,” and the “Safety Regulations for Metal and Non-metallic Mines.”
(2) The report can effectively guide the implementation of the technical renovation projects for brine wells No. 209, No. 301, and No. 302 in the Gaofengchang rock salt mining area of Chongqing Suote Salt & Chemical Co., Ltd., and must pass review by relevant authorities and experts.
3. Qualification Requirements for Bidders
3.1 Basic Qualification Requirements for Bidders
Bidders must be legal entities or other organizations registered and established within the territory of the People's Republic of China.
3.2 Specific Qualification Requirements for the Project
Possess one of the following qualifications issued by the housing and urban-rural development authorities: ① Grade A Comprehensive Qualification for Engineering Design; ② Grade B or Higher Qualification for Engineering Design in the Light Industry and Textile Sector (Light Industrial Engineering); ③ Grade B or Higher Qualification for Engineering Design in the Light Industry and Textile Sector (Salt Production and Salt Chemical Engineering); ④ Grade B or Higher Qualification for Engineering Design in the Light Industry and Textile Sector (Development of Well- and Mine-Mined Salt Mines).
3.3 This quotation does not accept bids submitted by consortia.
4. Quotation deadline
Deadline: July 23, 2024 (Beijing Time).
5. Contact Information
Price Comparison Person: Chongqing Sote Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Peng Xingshou Phone: 15923874799

 

 

Disclaimer: The official channel for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against those responsible for such unauthorized reproduction.