Detailed Route Planning and Price Comparison Document for the Sote Salt-Conversion New Brine Pipeline Project
Category: Bidding
Release time: 2026-08-19
Summary:
1. Price Comparison Conditions
Sote Salt Chemical Co., Ltd. plans to construct a new brine‑transport pipeline and is required to prepare a detailed planning scheme in accordance with the pipeline route identified during the developer’s preliminary site survey, ensuring alignment with Wanzhou District’s overall urban master plan while appropriately avoiding existing underground utility networks, railways, bridges, expressways, and other critical surface structures. The project owner is Chongqing Sote Salt Chemical Co., Ltd., with funding to be self‑financed. All conditions for price comparison have been met, and a competitive bidding process is now being initiated for the preparation of this detailed planning scheme.
2. Project Overview and Scope of Price Comparison
2.1 Project Location
Gaofeng Subdistrict—Shuanghekou Subdistrict—Longdu Subdistrict: Gaofeng Changyan Mine (buried pipeline installation)—Gaofeng Middle Road (buried pipeline installation)—Gaofeng Lingfeng Mountain (directional drilling crossing)—Mengzi East Road (buried pipeline installation)—Qinggangbang Interchange (pipe-jacking crossing)—Changqing Road (pipeline support installation/overbridge utility tunnel installation)—Sote Salt Chemicals’ salt‑making workshop.
2.2 Project Overview and Technical Proposal
Chongqing Sote Salt Chemical Co., Ltd. plans to construct a new Φ530 mm brine‑transport pipeline, which will be laid underground in a common trench. The pipeline will run from the Gaofeng Field rock‑salt mine in Gaofeng Subdistrict to the salt‑production workshop within Chongqing Sote Salt Chemical Co., Ltd. in Longdu Subdistrict. The entire route lies within Wanzhou District, Chongqing, passing through Gaofeng Town, Shuanghekou Subdistrict, and Longdu Subdistrict, with a total length of approximately 11.8 km.
In the non‑directional drilling crossing section, Φ530 mm steel‑reinforced polyethylene composite pipes are joined using specialized electrofusion fittings; they are installed either by underground burial, on pipe supports, or within pipe racks (for the bridge‑spanning segment). In the directional drilling crossing section, straight‑seam submerged‑arc welded steel pipes are employed, with a high‑temperature‑resistant PE liner. The PE liner is bonded to the inner surface of the seamless pipe under high pressure, and flanged connections are used at both ends of the directional drilling crossing. The design pressure is 2.0 MPa.
2.3 Scope of Services
(1) The detailed plan shall, to the greatest extent possible, be implemented in accordance with the route identified during the construction entity’s preliminary site survey. If it is indeed necessary to avoid existing underground utility networks, railways, bridges, expressways, or other critical surface structures, the pipeline route shall be adjusted through joint consultation among the construction entity and the feasibility study preparation unit.
(2) The detailed plan must be approved by the Wanzhou District Bureau of Planning and Natural Resources and undergo review by industry experts, and ultimately obtain approval from the Wanzhou District Government.
(3) The detailed plan shall be incorporated into the Wanzhou District Territorial Spatial Plan.
(4) The preparing entity shall be responsible for negotiating and coordinating the feasibility of the pipeline route plan, ensuring that the plan obtains approval from the relevant rights‑holding or managing (regulatory) authorities.
(5) Technical Requirements: Shall be in compliance with applicable laws and regulations, as well as relevant technical codes and standards issued by the state and industry.
(6) Process the preliminary land-use review and the site-selection opinion letter.
2.4 Construction Period Requirements
Within six months after the contract is signed, submit the “Detailed Route Planning for the New Brine Pipeline Project of Chongqing Suote Salt Chemical Co., Ltd.,” which has been reviewed and approved by the Wanzhou District Bureau of Planning and Natural Resources and industry experts.
2.5 Service and Quality Requirements
(1) Complies with the Urban and Rural Planning Law of the People’s Republic of China, the Chongqing Municipal Regulations on Territorial Spatial Planning, the Chongqing Municipal Land Management Regulations, and other relevant laws, regulations, and national standards.
(2) The detailed plan must be approved by the Wanzhou District Bureau of Planning and Natural Resources and undergo review by industry experts, and ultimately obtain approval from the Wanzhou District Government.
(3) The detailed plan shall be incorporated into the Wanzhou District Territorial Spatial Plan.
(4) The preparing entity shall be responsible for negotiating and coordinating the feasibility of the pipeline route plan, ensuring that the plan obtains approval from the relevant rights‑holding or managing (regulatory) authorities.
3. Qualification Requirements for Bidders
3.1 Basic Qualification Requirements for Bidders
Bidders must be legal entities or other organizations duly registered within the territory of the People’s Republic of China.
3.2 Specific Qualification Requirements for the Project
Bidders must hold a qualification certificate for urban and rural planning preparation, with a certification level of Class B or higher.
3.3 This quotation does not accept consortium bids.
4. Quotation Deadline
Deadline: August 26, 2026 (Beijing Time).
5. Contact Information
Price Comparator: Chongqing Sote Salt Chemical Co., Ltd.
Address: No. 98, Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Peng Xingxiu Phone: 15923874799
6. Administrative Supervisory Authorities and Contact Information
This procurement activity is subject to oversight by the Discipline Inspection and Supervision Group (the supervisory authority) of the Xiangyu Salt Chemical Region. Contact information: Tel. 023-61002070, Postal Code 404001, Email xyyhjw@126.com.
Disclaimer: The official platform for publishing this tender information is the official website of Chongqing Xiangyu Salt Chemical Co., Ltd. at http://www.cqxyyh.com. Except for this channel, our company has not published any tender information on any other websites, forums, or platforms. Any tender notices reproduced on other media that cite our company as the tendering entity are unauthorized reprints and are deemed invalid; we reserve the right to pursue legal action.