ENTERPRISE AFFAIRS

ENTERPRISE AFFAIRS

ENTERPRISE AFFAIRS

Safety Pre-evaluation Report for the Comprehensive Energy-Saving Renovation Project of the Xiangyu Salt & Chemical Ammonia System and Wastewater Treatment System (Second Price Comparison)

Category: Bidding

Release time: 2025-12-01

Summary:

Our company’s safety pre-assessment design for the comprehensive energy-saving renovation project of our ammonia system and wastewater treatment facilities is planned to be carried out through a request-for-quotation and price comparison procurement process to select the design service provider. We hereby invite your company to participate in the bidding for design services and kindly request that you provide a quotation for the fees required for the project’s design services.
I. Project Overview:
1. Project Location: Within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd., No. 98 Longxiang Avenue, Wanzhou District, Chongqing City.
2. Project Overview: 1. Combined-Alkali Screw Chiller Project: Within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd., a new centrifugal ammonia chiller with a rated power of 6,670 kW will be added to the combined-alkali unit. The existing seven screw chillers at the combined-alkali unit will be decommissioned, as will the current ammonia chiller at the synthetic ammonia unit. 2. Gas Ammonia System Project: A new low-power, low-temperature methanol wash gas-ammonia booster compressor will be installed. Instead of passing through the three-stage ammonia compression process, the low-temperature methanol wash gas ammonia will now be boosted in temperature and pressure by this new compressor before being sent to the ammonia absorption process in the combined-alkali unit. The gas ammonia from the combined-alkali ammonia cooler—equal in quantity to the amount absorbed—and the gas ammonia from the first ammonia cooler will be mixed together and fed into the combined-alkali chiller. After being boosted and heat-exchanged, the mixture will then be sent to the liquid ammonia storage tank.
The total project construction cost is approximately 51 million yuan.
II. Quotation Table:
Serial Number Design Content Quotation (without tax, in 10,000 CNY) Quotation (with tax, in 10,000 CNY) Remarks
1 Safety Pre-assessment Report
III. Qualification Requirements:
Must possess safety evaluation qualifications, and its business scope must cover petroleum refining, chemical raw materials, chemicals, and pharmaceutical manufacturing.
4. Quotation Method and Requirements:
1. The design service fee inquiry adopts a one-time quotation mechanism, and the total quoted amount already includes expert review fees and taxes. This project is divided into two sub-projects, and a single report will be prepared for both sub-projects combined.
2. The quotation materials must include:
The Quotation Letter and the Quotation Schedule, along with copies of your company’s business license and qualification certificates, must all be stamped with the official company seal.
3. The design period is required to be 60 calendar days.
4. No advance payment will be made for this project; payment will be made in one lump sum upon receipt of the official report.
V. Principles for Selecting the Design Service Provider:
The control price for this inquiry-based procurement bidding is set at 80,000 yuan (including tax at %). Provided that the qualifications and construction period meet the requirements, the design service provider will be selected solely based on the lowest tax-free quotation (no other fees will be paid).
6. Method for Participating in Price Comparison:
Please carefully complete the “Quotation Letter” and “Quotation Table” enclosed with this invitation letter, and submit them along with photocopies of your company’s business license, design qualification certificate, and other relevant documents by mail to No. 98 Longxiang Avenue, Wanzhou District, Chongqing City (Chongqing Xiangyu Salt & Chemical Co., Ltd.) before 2:00 p.m. on December 8, 2025. Recipient: Ran Guangbing, phone number: 18883612196.
VII. Other Matters:
1. All required documents must be provided in full, and photocopies, stamped documents, etc., must be clearly legible.
2. For access to technical documents related to this project and for any inquiries, please contact Ran Guangbing at 18883612196.
Supervision and Reporting Hotlines: 023-61002070, 13708371911; Reporting Email: xyyhjw@126.com

 

Disclaimer: The official platform for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against those responsible for such unauthorized reproduction.

Keywords: Safety Pre-evaluation Report for the Comprehensive Energy-Saving Renovation Project of the Xiangyu Salt & Chemical Ammonia System and Wastewater Treatment System (Second Price Comparison)