Bidding Documents for the Preparation of the Mining Plan Report for the Gaofengchang Rock Salt Mine Area of Chongqing Sote Salt & Chemical Co., Ltd.
Category: Bidding
Release time: 2025-10-31
Summary:
1. Price comparison conditions
This quotation project: In accordance with the Mineral Resources Law of the People’s Republic of China (Presidential Order No. 36 of the People’s Republic of China), after Chongqing Sote Salt Chemical Co., Ltd. has obtained the real estate certificate for its mining rights in the Gaofengchang Rock Salt Mining Area, it must re-apply for a mining permit. Currently, it is necessary to commission a technical agency to prepare a mineral resource exploitation plan, which will serve as one of the required documents for the Natural Resources Administration to issue the mining permit. The client responsible for preparing this exploitation plan is Chongqing Sote Salt Chemical Co., Ltd., and the funding will come from the company’s own resources. The project now meets the conditions for price comparison, and we are hereby inviting quotations for the preparation of the said exploitation plan.
2. Project Overview and Price Comparison Scope
2.1 Project Location
In the Gaofengchang rock salt mine area of Chongqing Sote Salt Chemical Co., Ltd.
2.2 Project Overview and Technical Solution
Based on the existing distribution of brine wells and the reserves of rock salt in the Gaofengchang Rock Salt Mine, and in accordance with current regulations, standards, and technical requirements (guidelines), prepare an mining plan for the Gaofengchang Rock Salt Mine of Chongqing Suote Salt Chemical Co., Ltd., providing the foundational geological basis for the project owner to obtain a mining permit.
2.3 Project Scale
According to the “Verification Report on Mineral Resource Reserves of the Gaofengchang Rock Salt Mine of Chongqing Sote Salt & Chemical Co., Ltd.,” submitted in July 2024 by the No. 107 Geological Team of the Chongqing Municipal Bureau of Geology and Mineral Exploration and Development, as of June 30, 2024, the total proven + controlled + inferred mineral resource reserves within the Gaofengchang rock salt mining area of Chongqing Sote Salt & Chemical Co., Ltd. for the three salt-bearing strata—T2b1-1, T2b1-3, and T2b3-2—amounted to 199,295 thousand tons (equivalent to 1,564,470 thousand tons of NaCl). Specifically, the proven reserves totaled 10,143 thousand tons (equivalent to 76,990 thousand tons of NaCl), the controlled reserves stood at 48,415 thousand tons (equivalent to 374,250 thousand tons of NaCl), and the inferred reserves reached 140,737 thousand tons (equivalent to 1,113,230 thousand tons of NaCl). With a comprehensive recovery rate of 25%, a reliability coefficient of 1.0 is applied to both the controlled and proven reserves, while a coefficient of 0.65 is used for the inferred reserves. Given a production scale of 1 million tons per year (in terms of brine equivalent salt), the estimated mineable ore reserves are 37,509 thousand tons, yielding a mine service life of approximately 28.9 years.
2.4 Contract Term
20 calendar days.
2.5 Service and Quality Requirements
(1) Complies with relevant national and industry technical standards and specifications issued by the People’s Republic of China, including the “Mineral Resources Law of the People’s Republic of China,” the “Notice from the General Office of the Ministry of Natural Resources on Issuing the Guidelines for Preparing Mineral Resource (Non-Oil and Gas) Development and Utilization Plans” (Natural Resources Office Document [2024] No. 33), the “Requirements for the ‘Three Rates’ Indicators of Mineral Resources” (Geological and Mineral Industry Standard of the People’s Republic of China DZ/T 0462), and the “Safety Regulations for Metal and Non-Metallic Mines.”
(2) The report must undergo review by an expert panel organized by the Wan Zhou District Bureau of Planning and Natural Resources, obtain their review comments, and meet the administrative approval requirements for issuing the mining permit.
3. Qualification Requirements for Bidders
3.1 Basic Qualification Requirements for Bidders
Bidders must be legal entities or other organizations registered and established within the territory of the People's Republic of China.
3.2 Specific Qualification Requirements for the Project
The technical team to be formed by the bidder must meet the following requirements: ① The project leader must hold an advanced or higher-level engineer qualification in a mining-related specialty; ② Other members of the project team must include technicians specializing in geology and mineral resources, hydrogeological and environmental geology, land resources, and geological surveying and mapping, all of whom must hold advanced or higher-level engineer qualifications.
3.3 This quotation does not accept bids submitted by consortia.
4. Quotation deadline
Deadline: November 6, 2025 (Beijing Time).
5. Contact Information
Price Comparison Person: Chongqing Sote Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Peng Xingshou Phone: 15923874799
6. Administrative Regulatory Authorities and Contact Information
This procurement activity is subject to the supervision of the Discipline Inspection and Supervision Group (regulatory authority) for the Xiangyu Salt & Chemical Zone. Contact information: 023-61002070, postal code 404001, email address xyyhjw@126.com.
Disclaimer: The official platform for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against those responsible for such unauthorized reproduction.
Keywords: Bidding Documents for the Preparation of the Mining Plan Report for the Gaofengchang Rock Salt Mine Area of Chongqing Sote Salt & Chemical Co., Ltd.
Relevant information
-
Selection Document for the Settlement Audit of the Access Road and Site Grading Works for Well ZK101 in the Xinfeng Mining Area Rock Salt Exploration Project of Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-11-10
-
Inquiry Letter for Rail Transport of Calcination Kiln Support Rollers (Wanzhou–Sanmenxia)
Time:2026-11-09
-
Price Comparison Document for the Installation of a Liquid Oxygen Pump with DC Busbar at Chongqing Xiangyu Salt Chemical Co., Ltd. (Second Price Comparison)
Time:2026-11-09
-
Topographic Map and Boundary Survey Bidding Documents for the Waste Salt Recovery and Comprehensive Utilization Project (Second Price Comparison)
Time:2026-11-09
-
Price Comparison Document for Outsourced Processing between Chongqing Xiangyu Salt Chemical and Sote Salt Chemical
Time:2026-11-09
