Bidding Documents for the Selection of Intermediary Agencies for the Re-examination of the Settlement of Well Workover Project No. 203 under the Second-Phase Reinforcement Project of Production Facility Structures

Category: Bidding

Release time: 2025-07-30

Summary:

I. Project Name:
1. Phase II Reinforcement Project for Production Facility Structures
2. Well Workover Project for Well 203
II. Company Name: Chongqing Xiangyu Salt & Chemical Co., Ltd.
III. Project Overview: Re-examination of Settlement
1. Scope of Work: Anchor bolt installation and rebar fabrication & installation, high-strength concrete pouring, carbon fiber bonding, demolition, anti-corrosion treatment, etc. Construction shall be carried out according to the drawings, plans, and list provided by the Employer. The contract amount is 1.04 million yuan, with a preliminary review amount of 1.01 million yuan.
2. Scope of Work: The entire operation for Well 203 workover project will be conducted under pressure, including but not limited to repairing the sewage recovery tank, reducing operational noise, plugging leaks, performing continuous tubing well control, opening the wellhead, installing blowout preventers, running a wireline through the technical casing, milling and reaming the wellbore, running a φ127mm technical casing along with cementing accessories, performing cementing operations, removing cement plugs and blind flanges. The contract amount is 2.85 million yuan, with an initial reviewed amount of 2.75 million yuan.
4. Pricing Method: Quantity-based pricing, using the 2018 Chongqing Quotations.
V. Time Requirements: The review must be completed within 20 calendar days after receipt of the relevant materials. Your organization is requested to provide a quotation based on your own circumstances. If the review is not completed within the specified timeframe, a penalty of RMB 500 per day will be imposed.
6. Please prepare a quotation tailored to the actual conditions of your organization for this project. The quotation file should be named using the format: Organization Name + Project Name, and sent to the 163 email address xiangyuyanhua@163.com. The fee structure is as follows: the basic fee is charged as a percentage of the submitted amount, and the review reduction benefit fee is charged as a percentage of the amount reduced during the review.
7. When submitting a quotation, you must provide basic information (including the business license, qualification certificate for engineering cost consulting firms, and office premises).
Copies of the premises lease (or purchase) contract and photos of the office space, etc.
8. Selection Method: The bidder with the lowest price will be selected.
9. Quotation deadline: 2:30 p.m. on August 4, 2025.
X. Contact Person and Supervisor
Contact: Teacher Yan Phone: 13452794584
Supervisor: Teacher Kang Contact number: 13340314091

 

Disclaimer: The official platform for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against such unauthorized reproductions.