1. Price comparison conditions
This quotation project—A batch of scheduled inspections for pressure pipelines undergoing major overhauls in 2025 by Chongqing Xiangyu Salt & Chemical Co., Ltd.—has been approved by Chongqing Xiangyu Salt & Chemical Co., Ltd. The project owner is Chongqing Xiangyu Salt & Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are hereby inviting quotations and conducting a price comparison for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd.
2.2 Project Scope: A batch of scheduled inspections for pressure pipelines undergoing major overhauls in 2025 within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd. (See attachment for the list: Package One—Scheduled Inspections for Major Overhaul Pressure Pipelines of Chongqing Xiangyu Salt & Chemical Co., Ltd.; Package Two—Scheduled Inspections for Major Overhaul Pressure Pipelines of Chongqing Xiangyu Salt & Chemical Co., Ltd.).
2.3 Contract Duration: The inspection task shall be completed within one month from the start of the major overhaul, subject to the notice from Party A.
2.4 Project Scope: A batch of scheduled inspections for pressure pipelines undergoing major overhauls in 2025 within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd. (See attached list: Package One—Scheduled Inspections for Major Overhaul Pressure Pipelines of Chongqing Xiangyu Salt & Chemical Co., Ltd.; Package Two—Scheduled Inspections for Major Overhaul Pressure Pipelines of Chongqing Xiangyu Salt & Chemical Co., Ltd.). The scheduled inspections for pressure pipelines do not include initial inspections involving radiographic testing (RT) or digital radiography (DR).
3. Qualification Requirements for Bidders
3.1 An independent legal entity registered within the territory of China;
3.2 Hold a non-destructive testing agency certification issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China (or the Administration for Market Regulation, the same hereinafter) or the China Special Equipment Inspection Association, and the certification shall include periodic inspection of pressure pipelines.
3.3 The collaborating entity shall provide evidence of having completed at least three relevant projects—such as scheduled inspections of pressure pipelines—in the petroleum and chemical industries since 2022 (based on the contract signing date).
3.4 Must be registered and approved on the Chongqing Municipal Special Equipment Information Management Platform.
3.5 Sound financial condition, with sufficient assets and capabilities to effectively perform the contract;
3.6 This price comparison requires bidders to assign the following personnel:
3.6.1 The project manager or site supervisor shall hold a special equipment operator qualification certificate issued by the Administration for Market Regulation or the General Administration of Quality Supervision, Inspection and Quarantine, and the certificate shall be valid.
3.6.2 Professional inspection personnel shall hold special equipment operator qualification certificates issued by the Administration for Market Regulation or the General Administration of Quality Supervision, Inspection and Quarantine, and such certificates shall be valid.
3.7 This quotation does not accept joint venture bids.
4. Inspections required by the contracting party:
4.1 Since Chongqing Xiangyu Salt & Chemical is a chemical enterprise, its production processes are characterized by high temperature, high pressure, flammability, explosiveness, toxicity, corrosiveness, high technological complexity, and significant safety risks. The successful bidder must, in accordance with the control requirements of Chongqing Xiangyu Salt & Chemical, sign a separate safety management agreement after signing this contract, clearly defining the rights and responsibilities of both parties as well as the liabilities for breach of contract. During the implementation of the project, the successful bidder shall earnestly implement safety and environmental protection measures at the construction site and comply with the tenderer’s safety management systems and assessment criteria. The contracting party reserves the right to assess and adjust the successful bidder’s progress, quality, and safety performance; the successful bidder shall actively cooperate with such assessments and adjustments. In cases of persistent non-cooperation or serious violations, the successful bidder’s qualification for contracting services will be revoked.
4.2 Issue a qualified periodic inspection report within two months from the date of completion of the inspection.
4.3 Price Comparison Quotation Requirements:
4.3.1 This request for quotation is divided into Package One and Package Two. Each package requires itemized pricing (the same entity may submit bids for both Package One and Package Two simultaneously). However, each entity can win only one of the packages. Provided that the requirements of the contracting authority are met, Package One and Package Two will be awarded based on the lowest total price respectively (if an entity submits the lowest total price for both Package One and Package Two, Package Two will be awarded preferentially).
4.3.2 Packages One and Two shall each be evaluated comprehensively based on their total prices (see attachment).
4.3.3 Settlement Method: The settlement amount shall be the product of the actual number of scheduled inspections conducted on-site by both parties and the unit price specified in the signed contract.
4.4.4 After Party A receives the inspection report and the special value-added tax invoice from Party B and records them in its accounts, Party A shall pay the full fee within two months. The payment method is bank acceptance.
4.4.5 The quotation includes the bidder’s labor costs, travel expenses, material costs, equipment usage fees, taxes, and inspection fees—and is not limited to these expenses. The contracting party will no longer pay any other fees separately.
4.4.6 The winning bidder must purchase insurance for construction personnel, with coverage of no less than 800,000 yuan per person (except for those covered by the company’s social security). The bidder shall provide Level 3 safety training upon entering the site and ensure that all workers wear uniform work attire as required by the tendering party. Personnel engaged in special operations must hold the appropriate certifications to take up their posts. These costs must be factored into the quotation.
5. Quotation deadline
Deadline: 5:00 PM (Beijing Time), May 28, 2025
6. Contact Information
Price Comparison Person: Chongqing Xiangyu Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Sun Tongying Phone: 13517321268

 

Disclaimer: The official platform for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against such unauthorized reproductions.

Keywords: 2025 Major Overhaul—Batch of Price Comparison Documents for Pressure Pipelines at Xiangyu Salt & Chemical Company