Bidding Documents for the Drilling Construction Design of Two Exploration Wells in the Xinfeng Rock Salt Exploration Project, Ganning Town, Wanzhou District, Chongqing Municipality
Category: Bidding
Release time: 2025-04-02
Summary:
1. Price comparison conditions
This quotation project—the bidding and comparison for the drilling construction design of two exploration wells for the Xinfeng Rock Salt Exploration Project in Ganning Town, Wanzhou District, Chongqing—has been approved by Chongqing Sote Salt Chemical Co., Ltd. The project owner is Chongqing Sote Salt Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are now inviting quotations and conducting a comparative price inquiry for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Tongping Village, Ganning Town, Wanzhou District, Chongqing City.
2.2 Project Scale: Two new exploration and production combined wells will be constructed in Tongping Village, Ganning Town, Wanzhou District, Chongqing Municipality, to investigate the occurrence of rock salt resources in the mining area. The main construction contents of the project include: geological mapping and surveying; hydrological, engineering, and environmental investigations; “three connections and one leveling” for the well site; pre-drilling works (including sewage recycling ponds, drilling rig foundations, equipment delivery and installation); drilling, core sampling, mud logging, well logging, cementing operations, and well sealing after completion.
2.3 Scope of Services: Preparation of drilling construction designs for two exploration wells in the Xinfeng Mining Area, and provision of technical consulting services (primarily technical consulting services during the drilling process of these wells).
2.4 Technical Requirements: Comply with the relevant technical specifications and standards promulgated by the national and industry authorities.
2.5 Design Qualifications: (1) Possess Grade B or higher qualifications in the light and textile industry (including development of well-mined salt mines, salt production, and salt chemical engineering); (2) Geologic exploration qualifications (geological drilling: Grade A). Any geologic exploration qualification certificates (geological drilling: Grade A) obtained prior to 2017 shall be deemed acceptable.
Meeting either of the two conditions is sufficient.
2.6 Construction Period Requirement: Completion within 30 days after the contract is signed.
3. Quotation deadline
Deadline: 5:00 p.m. (Beijing Time), April 7, 2025.
4. Contact Information
Price Comparison Person: Chongqing Sote Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Technical Contact: Xu Chenglong
Phone: 18883114497
Supervisory Contact: Reporting Hotline: 023-61002070; Reporting Email: xyyhjw@126.com
Disclaimer: The official channel for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against those responsible for such unauthorized reproduction.
Keywords: Bidding Documents for the Drilling Construction Design of Two Exploration Wells in the Xinfeng Rock Salt Exploration Project, Ganning Town, Wanzhou District, Chongqing Municipality
Relevant information
-
Selection Document for the Settlement Audit of the Access Road and Site Grading Works for Well ZK101 in the Xinfeng Mining Area Rock Salt Exploration Project of Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-11-10
-
Inquiry Letter for Rail Transport of Calcination Kiln Support Rollers (Wanzhou–Sanmenxia)
Time:2026-11-09
-
Price Comparison Document for the Installation of a Liquid Oxygen Pump with DC Busbar at Chongqing Xiangyu Salt Chemical Co., Ltd. (Second Price Comparison)
Time:2026-11-09
-
Topographic Map and Boundary Survey Bidding Documents for the Waste Salt Recovery and Comprehensive Utilization Project (Second Price Comparison)
Time:2026-11-09
-
Price Comparison Document for Outsourced Processing between Chongqing Xiangyu Salt Chemical and Sote Salt Chemical
Time:2026-11-09
