Bidding Documents for the Dismantling Project of the Thermoelectric Steam Turbine
Category: Bidding
Release time: 2025-03-17
Summary:
1. Price comparison conditions
This quotation project—the demolition and construction work for the thermal power steam turbine at Chongqing Sote Salt & Chemical Co., Ltd.—has been approved by Chongqing Sote Salt & Chemical Co., Ltd. The project owner is Chongqing Sote Salt & Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are hereby inviting quotations and conducting a competitive bidding process for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Within the premises of Chongqing Sote Salt & Chemical Co., Ltd.
2.2 Project Scope: Demolition and Removal Works for the Thermal Power Steam Turbine at Chongqing Suote Salt & Chemical Co., Ltd.: Protective removal of the main body and auxiliary equipment of the C25-8.83/0.49 extraction-condensing steam turbine unit, including associated steam pipelines, oil system pipelines, drain and condensate pipelines, etc. For specific details, please refer to the Bill of Quantities (the actual demolition locations shall be determined based on the operational conditions on-site). This project is a protective demolition undertaking. All auxiliary materials (including oxygen and acetylene), tools and equipment, lifting services, scaffolding, and other related supplies shall be provided by Party B.
2.3 Construction Period: Completion within 30 calendar days from the commencement date notified by Party A (the specific commencement date will be determined based on Party A’s production schedule).
2.4 Project Scope: Demolition and Removal Works for the Thermoelectric Steam Turbine at Chongqing Sote Salt & Chemical Co., Ltd.: Protective demolition of the main body and auxiliary equipment of the C25-8.83/0.49 extraction-condensing steam turbine unit, including associated steam pipelines, oil system pipelines, drain and condensate pipelines, etc. For detailed information, please refer to the Bill of Quantities (the specific demolition locations shall be determined based on the actual operational conditions permitted for handover on-site).
3. Qualification Requirements for Bidders
3.1 For this price comparison, bidders must possess: a valid Grade III or higher general contracting qualification for mechanical and electrical engineering construction issued by the competent construction administrative authority, as well as corresponding construction capabilities in terms of personnel, equipment, and funding.
3.1 This price comparison requires bidders to hold a valid safety production license.
3.1 Prior to the bid submission deadline, bidders must have completed at least one construction project involving the installation, removal, or maintenance of equipment of the same type or higher within the four years preceding the bid deadline (from January 1, 2021, to the bid submission deadline).
4. Quotation deadline
Deadline: 9:00 a.m. (Beijing Time), March 21, 2025
5. Contact Information
Price Comparison Person: Chongqing Sote Salt & Chemical Co., Ltd.
Address: No. 98, Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Bi Yawen Phone: 13896320600
Disclaimer: The official platform for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against such unauthorized reproductions.
Keywords: Bidding Documents for the Dismantling Project of the Thermoelectric Steam Turbine
Relevant information
-
Selection Document for the Settlement Audit of the Access Road and Site Grading Works for Well ZK101 in the Xinfeng Mining Area Rock Salt Exploration Project of Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-11-10
-
Inquiry Letter for Rail Transport of Calcination Kiln Support Rollers (Wanzhou–Sanmenxia)
Time:2026-11-09
-
Price Comparison Document for the Installation of a Liquid Oxygen Pump with DC Busbar at Chongqing Xiangyu Salt Chemical Co., Ltd. (Second Price Comparison)
Time:2026-11-09
-
Topographic Map and Boundary Survey Bidding Documents for the Waste Salt Recovery and Comprehensive Utilization Project (Second Price Comparison)
Time:2026-11-09
-
Price Comparison Document for Outsourced Processing between Chongqing Xiangyu Salt Chemical and Sote Salt Chemical
Time:2026-11-09