25-Year First Inspection Radiation (RT) Testing Price Comparison Document for Xiangyu Salt & Chemical Pressure Pipelines (Second Edition)

Category: Bidding

Release time: 2024-12-31

Summary:

Announcement on Price Comparison for First Inspection Radiographic (RT) Testing of Pressure Pipelines by Chongqing Xiangyu Salt & Chemical Co., Ltd. in 2025
1. Price comparison conditions
This quotation item—radiographic (RT) inspection for the initial examination of pressure pipelines in 2025 undertaken by Chongqing Xiangyu Salt & Chemical Co., Ltd.—has been approved by Chongqing Xiangyu Salt & Chemical Co., Ltd. The project owner is Chongqing Xiangyu Salt & Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are hereby inviting quotations and conducting a price comparison for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd.
2.2 Project Scope: Radiographic (RT) inspection of pressure pipelines within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd., to be conducted for the first time in 2025. The total cost shall be calculated based on the lowest unit price, provided that the requirements of the contracting party are met.
2.3 Contract Term: One year from the date on which the contract is signed and becomes effective.
2.4 Project Scope: Radiographic (RT) inspection of pressure pipelines within the premises of Chongqing Xiangyu Salt & Chemical Co., Ltd., scheduled for the first inspection in 2025.
3. Qualification Requirements for Bidders
3.1 An independent legal entity registered within the territory of China;
3.2 Hold the Approval Certificate for Special Equipment Inspection and Testing Institutions of the People’s Republic of China issued by the Administration for Market Regulation (non-destructive testing institution), the Certificate of Qualification for Inspection and Testing Institutions and its annexes (approved to engage in radiographic testing (RT), ultrasonic testing (UT), magnetic particle testing (MT), penetrant testing (PT), time-of-flight diffraction ultrasonic testing (TOFD), and other related inspection activities), or the Level Assessment Certificate for Non-Destructive Testing Institutions of Special Equipment.
3.3 Hold a radiation safety license issued by the environmental protection authority;
3.4 Hold certification certificates for quality, environmental, occupational health, and safety management systems;
3.5 Sound financial condition, with sufficient assets and capabilities to effectively perform the contract;
3.6 We maintain a strong cooperative relationship with the local Market Supervision Administration and the special equipment inspection agency in Wanzhou District, Chongqing Municipality, and unconditionally recognize the inspection reports they issue.
3.7 The project manager or on-site supervisor shall hold a practicing registration certificate for special equipment inspection and testing personnel (Level II or above in radiographic testing (RT), ultrasonic testing (UT), penetrant testing (PT), or magnetic particle testing (MT)).
Professional inspectors hold certificates of practice registration for special equipment inspection and testing personnel (Level I or above in radiographic testing (RT), ultrasonic testing (UT), penetrant testing (PT), or magnetic particle testing (MT)).
3.8 Since 2020 (based on the contract signing date), there must be performance records of nondestructive testing projects for petroleum and chemical engineering with individual contract amounts of RMB 200,000 or more (no fewer than 5 projects).
3.9 This quotation does not accept joint venture bids.
4. Inspections required by the contracting party:
4.1 The contracting party shall notify the winning bidder, within one week prior to the inspection, of the workload and requirements for the project inspection task. Upon receiving the task, the winning bidder must complete the inspection task in accordance with the contracting party’s requirements and timelines, and submit a valid inspection report to the contracting party within one week after the completion of the entire project inspection.
4.2 Qualification review method for this price comparison: post-qualification review;
4.3 Settlement Method: The settlement amount shall be the product of the actual quantity confirmed by on-site visa between both parties and the unit price stipulated in the signed contract.
4.4 After Party A receives Party B’s inspection report and invoice and posts them to its accounts, Party A shall pay the fee for each batch in a single lump sum within two months. The payment method is bank acceptance.
4. Quotation deadline
Deadline: January 7, 2025, 9:00 a.m. (Beijing Time)
5. Contact Information
Price Comparison Person: Chongqing Xiangyu Salt & Chemical Co., Ltd.
Address: No. 98, Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Teacher Sun
Phone: 13517321268

Keywords: 25-Year First Inspection Radiation (RT) Testing Price Comparison Document for Xiangyu Salt & Chemical Pressure Pipelines (Second Edition)