Invitation for Quotation on the Construction Design Specification for the New 302 Wells at the Salt-Mining Mine
Category: Bidding
Release time: 2024-09-18
Summary:
Our company plans to add a new brine well (Well 302) within the Gaofengchang Rock Salt Mine area. We now need to prepare a drilling construction design for Well 302 in accordance with the latest design standards and specifications. We hereby invite your company to provide a quotation for the fees required for the project’s design services.
I. Project Overview
1. Project Location: Well Pad 302 is located 250 meters southwest of Well 203 in the Gao Fengchang Rock Salt Mining Area, Wan Zhou District, Chongqing Municipality.
2. Project Overview
An additional directional horizontal well will be drilled at the No. 302 well site to connect with the cavity of Well Wan 208. Upon completion and commissioning, the new well is expected to increase annual production (in terms of brine equivalent salt) by 110,000 tons. The main construction components of this project include: pre-drilling works (including wastewater recovery ponds, drilling rig foundations, equipment arrival and installation), drilling operations, directional drilling, logging, and cementing operations, as well as the installation of wellhead equipment after well completion.
II. Design Scope and Requirements
The design of this project includes: drilling construction design, drilling engineering cost estimation, trajectory design, and adjustment of the horizontal well trajectory following completion of the pilot well, as well as technical advisory services (primarily referring to technical advisory services during the well’s construction process).
Technical Requirements: Comply with the relevant technical specifications and standards issued by the national and industry authorities.
Construction period requirement: Completion within 30 days after the contract is signed.
III. Design Qualification Requirements
Must possess Grade B or higher qualifications in the light and textile industry (including well-mine salt mine development, salt production, and salt chemical engineering).
IV. Quotation Method and Requirements
1. The design service fee is subject to a one-time quotation mechanism, and the total quoted amount already includes taxes (a special value-added tax invoice will be provided, with a tax rate of 6%).
2. Quotation Materials
You must include the attachment “Quotation Letter” to this invitation letter, as well as your company’s qualification documents (business license, design qualification documents, commercial credit documents, etc.). All of the above documents must be stamped with the official company seal.
V. Principles for Awarding the Contract
The control price for this inquiry, comparison, and bidding procurement is set at 170,000 yuan. Under the condition that the qualifications meet the requirements, the bidder with the lowest quote will win the contract.
VI. Method for Participating in Price Comparisons
Please carefully complete the “Quotation Letter” attached to this invitation letter, and include your company’s business license, design qualification documents, commercial credit documents, and other relevant materials. Send the completed documents in PDF format to the Discipline Inspection Commission email address of Xiangyu Yanhua: xiangyuyanhua@163.com. The deadline for submission is 5:00 p.m. on September 23, 2024.
VII. Other Matters
If you have any questions about this project, please contact Xu Chenglong from the Salt Production Division.
Contact phone: 18883114497.
Chongqing Sote Salt & Chemical Co., Ltd.
September 18, 2024
Disclaimer: The official channel for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against such unauthorized reproductions.
Keywords: Invitation for Quotation on the Construction Design Specification for the New 302 Wells at the Salt-Mining Mine
Relevant information
-
Selection Document for the Settlement Audit of the Access Road and Site Grading Works for Well ZK101 in the Xinfeng Mining Area Rock Salt Exploration Project of Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-11-10
-
Inquiry Letter for Rail Transport of Calcination Kiln Support Rollers (Wanzhou–Sanmenxia)
Time:2026-11-09
-
Price Comparison Document for the Installation of a Liquid Oxygen Pump with DC Busbar at Chongqing Xiangyu Salt Chemical Co., Ltd. (Second Price Comparison)
Time:2026-11-09
-
Topographic Map and Boundary Survey Bidding Documents for the Waste Salt Recovery and Comprehensive Utilization Project (Second Price Comparison)
Time:2026-11-09
-
Price Comparison Document for Outsourced Processing between Chongqing Xiangyu Salt Chemical and Sote Salt Chemical
Time:2026-11-09