Thermal Power No. 2 Turbine Overhaul Price Comparison Document
Category: Bidding
Release time: 2024-05-10
Summary:
1. Price comparison conditions
This quotation project—maintenance of Turbine No. 2 at the thermoelectric plant of Chongqing Sote Salt Chemical Co., Ltd.—has been approved by Chongqing Sote Salt Chemical Co., Ltd. The project owner is Chongqing Sote Salt Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are hereby inviting quotations and conducting a competitive bidding process for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Within the premises of Chongqing Sote Salt & Chemical Co., Ltd.
2.2 Project Scope: Overhaul of Turbine No. 2 for the combined heat and power plant within the premises of Chongqing Sote Salt & Chemical Co., Ltd.
Serial Number Maintenance Item Maintenance Time Required
1. Inspection of the tightness and flexibility of the automatic main steam valve and regulating valve – 48 hours
2. Medium-pressure oil actuator (steam extraction) maintenance and commissioning – 24 hours
3. Flying hammer inspection and adjustment – 8 hours
4 Axial Displacement Installation Calibration 8 hours
Total: 48 hours
2.3 Construction Period: The maintenance work shall be completed and the unit shall be ready for startup within two calendar days starting from the completion of the steam turbine’s shutdown, cooling, insulation, and dismantling. The specific timing shall be subject to the notice from Party A.
2.4 Project Scope: Overhaul of Turbine No. 2 for the combined heat and power plant within the premises of Chongqing Sote Salt Chemical Co., Ltd.; see Technical Requirements for details.
3. Inspection and Acceptance Criteria:
3.1 After maintenance, the automatic main steam valve and high-pressure regulating valve close tightly; the regulating valves operate flexibly without any sticking or jamming.
3.2 The medium-pressure oil actuator shall be able to fully open and fully close, operate flexibly during adjustment without any sticking or jamming, and the oil pipelines shall show no vibration.
3.3 The clearance between the emergency governor hook and the flyweight is 0.9 to 1.1 mm, and the overspeed test was passed.
3.4 The axial displacement shall be zeroed according to the specified calibration procedure.
4. Quotation deadline
Deadline: 12:00 (Beijing Time), May 12, 2024
5. Contact Information
Price Comparison Person: Chongqing Sote Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Sun Tongying
Phone: 13517321268
Keywords: Thermal Power No. 2 Turbine Overhaul Price Comparison Document
Relevant information
-
Selection Document for the Settlement Audit of the Access Road and Site Grading Works for Well ZK101 in the Xinfeng Mining Area Rock Salt Exploration Project of Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-11-10
-
Inquiry Letter for Rail Transport of Calcination Kiln Support Rollers (Wanzhou–Sanmenxia)
Time:2026-11-09
-
Price Comparison Document for the Installation of a Liquid Oxygen Pump with DC Busbar at Chongqing Xiangyu Salt Chemical Co., Ltd. (Second Price Comparison)
Time:2026-11-09
-
Topographic Map and Boundary Survey Bidding Documents for the Waste Salt Recovery and Comprehensive Utilization Project (Second Price Comparison)
Time:2026-11-09
-
Price Comparison Document for Outsourced Processing between Chongqing Xiangyu Salt Chemical and Sote Salt Chemical
Time:2026-11-09
