Comparison and Selection of Drawings for the Chongqing Xiangyu Salt & Chemical Battery-Grade Soda Ash Production Project

Category: Bidding

Release time: 2024-04-16

Summary:

In accordance with the requirements of the “Notice on Optimizing the Management of Survey and Design for Small, Low-Risk Construction Projects with Social Investment” issued by the Municipal Housing and Urban-Rural Development Commission and the Municipal Finance Bureau (Yu Jian [2019] No. 469), this selection process is intended to identify a construction drawing review agency for small, low-risk construction projects with social investment in Wanzhou District, Chongqing. The commissioning party is Chongqing Xiangyu Salt & Chemical Co., Ltd., and the selection criteria have now been met.
I. Project Overview:
(1) Name: Comparative Selection of Construction Drawing Review Agencies for the 10,000-ton/year Battery-Grade Soda Ash Production Project of Chongqing Xiangyu Salt & Chemical Co., Ltd.
(2) Location: No. 98, Longxiang Avenue, Wanzhou District, Chongqing City
(3) Cooperation Period: 180 days after the contract is signed, provided that the project has been approved for filing.
(4) Scope of Work: Total floor area approximately 4,012.71 square meters.
(5) According to the Notice issued by the Chongqing Municipal Survey and Design Association on the Release of the “Guiding Opinions on Fees for Review of Construction Drawing Design Documents in Chongqing” (Yu She Xie Zi [2019] No. 05), the fee for the review of construction drawings for building projects shall be charged at 100% of the rates specified in Yu She Xie Zi [2019] No. 05. The final settlement amount shall be calculated by multiplying the unit price determined through actual competitive bidding by the area.
(6) Quality Requirements: Comply with relevant regulations of the construction administrative authorities as well as current national and local engineering design codes and standards.
(7) Requirements for deliverables: The design drawings for this project will be issued in multiple phased stages. It is mandatory to prepare and submit phased deliverables in accordance with the requirements of the construction entity to support the building permit application process.
II. Establishment of Applicants and Eligibility Requirements
(1) Business License
(2) Category I Review of Building Construction
III. Submission of Materials
(1) The bidding documents have been sent to the designated email address in electronic format or as scanned copies (in a compressed file).
1. Letter of Application for Comparative Selection
2. Proof of identity of the legal representative or power of attorney
3. Photocopy of business license
4. Photocopy of qualification certificate
5. A copy of the ID card of the legal representative of the applicant for the selection process, or a copy of the ID card of the authorized agent.
IV. Requirements for the Selected Entities
1. Sign the contract with the commissioning entity within 5 days after receiving the notice of selection.
2. After the construction unit has completed the construction drawing design and submitted a request for review of the construction drawings to the District Housing and Urban-Rural Development Commission, it must issue the construction drawing review report within 4 working days from the date of acceptance of the review application.
V. Appendix
Appendix 1: Instructions for Bidding Applicants
Appendix II: Format for Completing the Comparative Selection Application Documents
Appendix 3: Contract


Contact: Teacher Zhang Phone: 13896345341
Supervisor: Teacher Shi Phone: 13708371911


April 18, 2024