Comparison of Repair Costs for Salt-Producing, Brine-Generating, and Diesel Generator Maintenance
Category: Bidding
Release time: 2024-04-20
Summary:
1. Price comparison conditions
This quotation project—maintenance and overhaul of diesel generators for salt and brine production at Chongqing Sote Salt & Chemical Co., Ltd.—has been approved by Chongqing Sote Salt & Chemical Co., Ltd. The project owner is Chongqing Sote Salt & Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are hereby inviting quotations and conducting a price comparison for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Within the premises of Chongqing Sote Salt & Chemical Co., Ltd.
2.2 Project Scope: Maintenance of the diesel generator used for salt and brine production within the premises of Chongqing Sote Salt & Chemical Co., Ltd. The generator model is G128-200Kw, and its original manufacturer was Weifang Diesel Generator Factory. It was manufactured in May 2008. The repair work will be outsourced, and parts such as the oil pump plunger and oil pump outlet valve will need to be replaced.
2.3 Construction Period: To be completed according to Party A’s requirements.
2.4 Project Scope: Maintenance of diesel generators for salt and brine production within the premises of Chongqing Sote Salt & Chemical Co., Ltd.—see the maintenance checklist for details.
3. Quotation deadline
Deadline: 5:30 p.m. (Beijing Time), April 22, 2024
5. Contact Information
Price Comparison Person: Chongqing Sote Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Sun Tongying
Phone: 13517321268
Keywords: Comparison of Repair Costs for Salt-Producing, Brine-Generating, and Diesel Generator Maintenance
Relevant information
-
Selection Document for the Settlement Audit of the Access Road and Site Grading Works for Well ZK101 in the Xinfeng Mining Area Rock Salt Exploration Project of Chongqing Sote Salt Chemical Co., Ltd.
Time:2026-11-10
-
Inquiry Letter for Rail Transport of Calcination Kiln Support Rollers (Wanzhou–Sanmenxia)
Time:2026-11-09
-
Price Comparison Document for the Installation of a Liquid Oxygen Pump with DC Busbar at Chongqing Xiangyu Salt Chemical Co., Ltd. (Second Price Comparison)
Time:2026-11-09
-
Topographic Map and Boundary Survey Bidding Documents for the Waste Salt Recovery and Comprehensive Utilization Project (Second Price Comparison)
Time:2026-11-09
-
Price Comparison Document for Outsourced Processing between Chongqing Xiangyu Salt Chemical and Sote Salt Chemical
Time:2026-11-09
