ENTERPRISE AFFAIRS

ENTERPRISE AFFAIRS

ENTERPRISE AFFAIRS

Bidding Documents for the Demolition and Installation of Traveling Beams in the Coal Shed for Xiangyu Salt & Chemical Gasification Project (Second Bidding)

Category: Bidding

Release time: 2025-10-21

Summary:

1. Price comparison conditions
This quotation project—the dismantling and installation work for the traveling beam of the coal shed at Chongqing Xiangyu Salt & Chemical Gasification Plant—has been approved by Chongqing Xiangyu Salt & Chemical Co., Ltd. The project owner is Chongqing Xiangyu Salt & Chemical Co., Ltd., and the project now meets the conditions for competitive bidding. We are hereby inviting quotations and conducting a competitive price comparison for this project.
2. Project Overview and Price Comparison Scope
2.1 Project Location: Chongqing Xiangyu Salt & Chemical Co., Ltd.
2.2 Project Scope: Demolition and Installation of Gantry Beams for the Coal Shed at Chongqing Xiangyu Salt & Chemical Co., Ltd.: Demolish the existing steel beams (740×250), with a total length of 84 meters; demolish the existing 43p rails, also totaling 84 meters; fabricate and install new steel beams (740×300), with a total length of 84 meters (including reinforcement); install and adjust 84 meters of new 43p rails (made of 42GrMo steel); all components such as pressure plates, clamps, and bolts will be completely replaced. The steel beams will undergo sandblasting to remove rust to Sa2 standard, followed by two coats of epoxy primer and two topcoats. For detailed specifications, please refer to the Bill of Quantities.
2.3 Construction Period: Completion within 30 calendar days, calculated from the commencement date notified by Party A.
2.4 Project Scope: Demolition and Installation Works for the Overhead Traveling Gantry Beams in the Coal Gasification Shed of Chongqing Xiangyu Salt & Chemical Co., Ltd.: Demolition of existing steel beams (740*250), 84 meters in length; demolition of 84 meters of existing No. 43 rail tracks; fabrication and installation of new steel beams (740*300), 84 meters in length (including reinforcement); installation of 84 meters of new No. 43 rail tracks (42GrMo) (including installation and alignment). All components such as pressure plates, clamps, and bolts will be completely replaced. The steel beams will undergo sandblasting for rust removal to meet Sa2 standard, followed by two coats of epoxy primer and two topcoats. For detailed specifications, please refer to the Bill of Quantities.
3. Qualification Requirements for Bidders
3.1 For this price comparison, bidders must hold a valid business license and possess Grade B or higher qualifications for bridge and gantry cranes, as well as demonstrate adequate construction capabilities in terms of personnel, equipment, and financial resources.
3.1 This price comparison requires bidders to hold a valid safety production license.
4. Quotation deadline
Deadline: October 27, 2025, 14:30 (Beijing Time)
5. Contact Information
Price Comparison Person: Chongqing Xiangyu Salt & Chemical Co., Ltd.
Address: No. 98 Longxiang Avenue, Wanzhou District, Chongqing City
Contact: Sun Tongying
Phone: 13517321268

 

Disclaimer: The official platform for our company’s announcement of this tender is the website of Chongqing Xiangyu Salt & Chemical Co., Ltd.: http://www.cqxyyh.com. Apart from this, our company has not published any tender information on any other websites, forums, or media platforms. Any tender information reproduced from other sources and attributed to our company as the tendering entity is unauthorized and therefore invalid. We reserve the right to pursue legal action against such unauthorized reproductions.

Keywords: Bidding Documents for the Demolition and Installation of Traveling Beams in the Coal Shed for Xiangyu Salt & Chemical Gasification Project (Second Bidding)